Denna fotboll engelska baseball tröja lektion presenterar, praktiserar och testa 10 Billiga nfl tröjor som är relaterade till kläder. Vårt brett utbud av olika fotbollsartiklar cykelbyxor inkluderar shorts, strumpor, t- shirts och till och med xn--billigatrningstights-jzb.com specialiserade underkläder.Fri frakt och gratis avkastning på Köp VR46 Collegetröjor online poster. Under de nio år sedan lanseringen blev en av de xn--piktrjor-d1a6k.com online-återförsäljare i att erbjuda trendledd mode för dem som har en budget.

Projects Details

Click here to enlarge the image above

Use the arrow or the scroll bar to see more images

Similar vehicles

3.5 tonne removal vans  

single axle 3.5 tonne van   

4 Container day cab

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects

This Project started out as a 4 container Renault sleeper cab 

It had a Marsden Vanplan removal body which we removed  and fitted to a day cab Daf cf 65 250.

 We removed the original pod and fitted another used day cab sleeper pod. The vehicle and body were completely refurbished inside and out. We removed the doors, all the floors and then replaced all the parts that were needed to provide added support.

The vehicle was supplied with our own new removal truck alloy ramps and side table.

The vehicle was also supplied with a 12 months mot, and painted to the customer specification.


Return to Projects